Shipping port at sunset with stacked containers

Record Port Volumes, Rising Dwell Times: What Shippers Could Be Overpaying

Dave BlinderLogistics, Shipping Costs

October 26, 2026. Southern California’s two largest container ports set monthly cargo records in September. The Port of Los Angeles handled 1,042,652 TEUs, while the Port of Long Beach moved 997,177 TEUs. The numbers point to resilient import activity—but they also raise a practical question for manufacturers and other shippers: Is the total cost of getting containers inland being managed as carefully as the ocean rate?

The Port of Los Angeles confirmed its busiest month on record on October 9. Long Beach reported its own all-time record on October 15, with officials emphasizing that terminal operations handled the surge without major congestion. At the same time, container dwell data show some cargo spent longer at the San Pedro Bay complex before moving onward.

Container dwell times rose in September 2026

The Pacific Merchant Shipping Association reported higher average dwell times across the Los Angeles–Long Beach port complex. Dwell time measures how long a container remains at a marine terminal before departing by truck or rail. Rising dwell is not the same as a finding of port-wide congestion, nor does it mean every shipment incurred additional charges. It is, however, an operational indicator shippers should monitor.

Container movementAugust 2026September 2026
Local truck-bound cargo2.95 days3.18 days
Rail-bound cargo6.75 days7.19 days

Source: Pacific Merchant Shipping Association, October 15, 2026. Rail-bound cargo showed the greater absolute dwell time, creating a reason to review rail connections and container availability closely.

Why record port activity matters to a shipper’s freight budget

Record throughput alone does not prove that shippers are paying more. The financial exposure depends on individual freight agreements, cargo availability, free-time provisions, inland transportation and delivery requirements. But when import volumes and dwell times change, it is sensible to revisit the entire shipment cost—not merely the ocean carrier’s headline price.

1. Demurrage, detention and storage exposure

Containers that remain at terminals or outside free-time allowances may generate charges depending on the contract and the circumstances. Review the underlying events and invoices rather than assuming that every dwell increase creates a fee. CPC’s accessorial charges and surcharges guidance explains why costs beyond linehaul deserve attention.

2. Drayage and chassis economics

Port-to-warehouse transportation can include chassis, waiting-time, fuel and appointment-related terms that differ among providers. An ocean rate reduction can be offset by avoidable inland charges or suboptimal pickup scheduling. Analyze total door-to-door expense by shipment and lane.

3. Rail and inland connections

Rail dwell at 7.19 days deserves attention for importers using intermodal services. A reliable budget should account for transit variability, carrier commitments and inventory implications. The relevant comparison is not simply the lowest quoted rail or truck rate; it is the overall cost and service performance of the chosen routing.

4. Port and network selection

Importers may adjust gateways in response to canal restrictions, fuel expense, tariffs or transit-time priorities. The best port choice can change when inland transportation and inventory costs are included. CPC recommends comparing realistic alternatives with the shipper’s actual origins, destinations and delivery commitments.

A new operational variable: Vincent Thomas Bridge work

Another near-term consideration is the planned November 7 start of the Vincent Thomas Bridge deck-replacement project. Port of Long Beach officials have announced additional evening and Saturday terminal gates for a limited period to provide flexibility while the work begins. Companies routing drayage through the San Pedro Bay region should verify current access arrangements and appointment plans with their transportation providers.

Source: Port of Long Beach October 15 announcement.

Five questions importers should ask before 2027 budgets are finalized

  • Are container-related accessorials rising? Compare actual charges with volume, terminal events and free-time terms.
  • Are drayage rates genuinely competitive? Check total invoices, not only quoted base rates.
  • Could rail or routing changes improve total cost? Model feasible alternatives without overlooking transit-time requirements.
  • Are ocean contracts protecting capacity and service? Review allocations, surcharges and exceptions by trade lane.
  • Can the organization demonstrate realized savings? Benchmark comparable transactions and verify changes after implementation.

For further context, see CPC’s ocean freight volatility and 2027 contract strategy analysis, ocean freight fundamentals and freight cost reduction services.

CPC’s view: Know what your freight should really cost

High cargo volumes can coexist with strong port performance and higher dwell times. Rather than guessing whether a port headline is good or bad for costs, manufacturers and importers should test what is happening inside their own transportation program: ocean contracts, inland movements, accessorial invoices, carrier performance and routing choices.

CPC Consultants works from the shipper’s side to benchmark transportation economics and identify measurable freight savings opportunities across modes and networks. If you are building your 2027 freight budget, this is an appropriate time to find out whether your current costs are competitive.

Prefer a conversation? Contact CPC Consultants.

Sources